Yangtze River
Tour Day Eleven: Tuesday, May 1, 2001
San Dou Ping Three Gorges Dam Site
| |
Obserbation Platform.
People line the railing of the very highest point at the project site.
It's time to go back to the ship.
|
The Parking Lot Overlooks The Lock Construction.
An Unexpected Bridge Crossing
Vivian Leads The Parade Back Down The Stairs.
Looking Up River From The Stairway
Moving On Down The river
Click any image for the next page.
|